waste to energy

Waste to energy

 

More details

waste to energy bo

$0.00

We build Bosch Plants with Siemens/GE turbines Plasma Plants burn at 6000 degrees no sorting/drying.
Plants are $1.5M per MW 100MW plant $150M with $75+M Ebidta (PPA $.12/kw and $35+/ton waste)
 

Currently it sorts 500,000 tons of household waste per year into 65,000 tons of recycling and rubbish
than can be converted into energy. Each year Quarry
can create enough power for 120,000 homes.

Current Offers

100mw 75,000,000.00 EBIDTA

Cost: $150,000,000.00

200mw 150,000,000.00 EBIDTA

Cost: $300,000,000.00

Characteristics

The waste that would normally go into landfill sites
can be re-used. The fuel is obtainable cheaply. There
will always be a reliable source of fuel as people will
always have waste

Current landfill sites can be mined out and the landfill material used as fuel

Write your review

waste to energy

waste to energy

Waste to energy

 

Write your review

New products

» Do not allow new products at this time.