2011 Frame 6FA CC 255MW 50HZ

2011

Frame 6FA

CC

255MW

50HZ

More details

rich

$65,000,000.00

Recovered Energy Solutions US of A Offering;

A 225 MW GAS BASED POWER PLANT
 A COMBINED CYCLE PLANT CCPP
 The offering is for 225MW total gross output
 Unit-1 GT-77.1 MW (ISO)
 Unit-2 GT-77.1 MW (ISO)
 Unit-3 ST-85.2 MW (ISO)
 The plant is designed for 225 MW for all the common equipment and infrastructure
is included in the sale.
€65 MM as is where is Asia Installed Condition.
€70 MM disassembled where is as is ready to ship.
Note; Add € 100 MM for EPC relocated and installed
Two Years Plus minimum for a Turnkey RES EPC offering.
Turnkey fully repurposed 225 MW rated two (2) X two X 1

My one and only Firm Written RES Offering for 2021.

If they want or desire a turnkey GE LM 6PG 2 X 2 X 1
Suggest they write back, prove their funds to you and I.
Also must show offer a letter of intent and POF.
They must then sign a RES NDNC prior to new PG
EPC or Equipment offerings.

Write your review

2011 Frame 6FA CC 255MW 50HZ

2011 Frame 6FA CC 255MW 50HZ

2011

Frame 6FA

CC

255MW

50HZ

Write your review