Looking investor for new renewable energy

runs 24/7
 I will send you the videos


More details

aldo

Availability: This product is no longer in stock

$0.00

Add to cart
looking for help to set up a factory to assemble new renewable energy machines, 
runs 24/7 They already have the machine working but they need to buy and organize to mount them in series.
 If you are interested, I will send you the videos

Let me share a few facts that we can discuss and hopefully come to an understanding.
1. We currently have 4 standard unit sizes / outputs; 15kw, 50kw, 80kw and 300kw.
 we also have working designs for 500kw and 1mw.
 2. Different sizes allow different market applications. all different sizes
they are basically connected and monitored in the same way.
 3. Sizes above 300kw unit are built on site due to size
and weight of individual components.
 4. All of our components are currently made in China. the companies we deal with
 allow us the best prices and flexibility so far. in the future we may outsource to others.
 5. So the assembly plant to start with can be just that: an assembly plant.
 all components are ordered in China and complete systems can be assembled in your country
 or somewhere else
. 6. A central location to start would be great, allowing distribution, logistics, monitoring and
 maintenance is managed from there.
 7. We advise that you purchase a SAFE building large enough to house
all components, equipment, additional materials, monitoring stations, test stations, etc.
 with enough room for growth.
 8. Logistics will be another management issue for the assembly plant. trucks or trains and a lot of labor.
 9. Initially, we believe that a manual assembly plant would be the best and easiest to install and
it would make it possible to offer a large number of jobs to the local economy.
 In addition, the assembly plant will need electrical engineers
, electricians, welders, fabricators, laborers, drivers, accountants, computer technicians and much more.
10. Decisions can be made as to whether all assembly plants will produce units of all sizes
or if maybe some different buildings / floors will handle only 1 or 2 of the sizes.
11. An assembly line can produce approximately 6 units per day once the templates
 They are made and in place and the assembly crews are trained and have some experience.
 12. Once assembled, each unit will require a minimum of 48 hours of continuous testing.
 13. Larger units require approximately 24 hours once templates are in place
 and the assembly team is trained and experienced.
14. Depending on the number of assembly lines you want to set up to start with,
 You can see that a large number of units can be produced in a single assembly plant.
 15. We would need to discuss local costs and revenue share.

 

Write your review

Looking investor for new renewable energy

Looking investor for new renewable energy

runs 24/7
 I will send you the videos


Write your review